Empty auditorium with stage and seating.

D. L. Adams Associates provided design services for the rigging systems for the new Skyline High School in Millcreek, Utah. In the Auditorium, we designed a full-fly stage rigging system with motorized hoists for heavy scenic and technical equipment, along with a fully motorized orchestra pit lift and a full-stage orchestra shell—supporting everything from musical theatre and orchestral performances to guest lectures and large-school events. In the Black Box Theatre, the design included a pipe grid and a flexible curtain-track system with track-switches, enabling fast, easy reconfiguration of the space with drapery.

How can we help you with you next project?